← Back

Wire · operational-macro

COP31 leaders warn grids and storage can't keep pace with renewable energy growth ...

Published

23 November 2026

Topic

operational-macro

◆ Sectors

Climate Tech

◆ Geography

Global

◆ Source

Read at power-eng.com →

◆ Verified

Fusion42 · 23 November 2026 · Fusion42 review

COP31 leaders warn that grid infrastructure and energy storage capacities are lagging behind the rapid growth of renewable energy projects globally, creating bottlenecks that could slow the energy transition despite falling generation costs. Industry experts call for regulatory reforms, faster permitting, and better utilisation of existing transmission assets to unlock stalled renewable projects and meet international storage targets.

This Wire brief sits within Fusion42's coverage of Climate Tech.

◆ ◆ The Wire takeaway

Grid and storage bottlenecks are the new limit for renewable energy growth worldwide, creating a rare opportunity for founders in battery storage and transmission optimisation. You must engage regulators and utilities this week to influence the reforms that will unlock stalled projects and capital.

◆ Coverage

1 source · 23 Nov 2026

◆ Related on Wire

◆ Topics

Climate Techrenewablesgrid-constraintsenergy-storageregulatory-reforminfrastructure