← Back

Wire · technology

SpaceX Colossus 2: Tesla Megapacks to Deliver 3.3 GWh Grid Battery

Published

25 September 2026

Topic

technology

◆ Sectors

Clean Energy

◆ Geography

United States

◆ Source

Read at basenor.com →

◆ Verified

Fusion42 · 25 September 2026 · Fusion42 review

SpaceX's Colossus 2 AI training campus in Memphis will deploy 3.3 GWh of Tesla Megapacks battery storage, making it likely the largest grid-connected battery in the U.S. The installation is designed to stabilise power transients from GPU workloads and replaces temporary gas turbines, with a 1.2 GW permanent gas plant authorized to come online by mid-2027.

This Wire brief sits within Fusion42's coverage of Clean Energy.

◆ ◆ The Wire takeaway

SpaceX is setting a new scale for battery storage linked to AI compute power, signalling that founders building power-intensive AI or data centres should plan for larger, rapid-response energy storage. Tesla's Megapacks are now proven tech for smoothing massive GPU power swings faster than gas plants can react.

◆ Coverage

1 source · 25 Sep 2026

◆ Related on Wire

◆ Topics

Clean Energyspace-xteslamegapacksgrid-storageai-trainingbattery