Wire · technology
Linde to build 200000-tonne CO2 capture plant at Swedish waste-to-energy facility
◆ Sectors
◆ Geography
◆ Source
◆ Verified
Fusion42 · 16 October 2026 · Fusion42 review
Linde Engineering will build and commission a 200,000 tonne per year CO2 capture plant at the Filbornaverket waste-to-energy facility in Helsingborg, Sweden, with CO2 stored offshore in Norway. The project, costing SEK 2.4bn ($242m), starts construction this year aiming for 2029 operations, combining BASF and Linde technologies, and is supported by EU and Swedish Energy Agency grants.
This Wire brief sits within Fusion42's coverage of Clean Energy.
◆ ◆ The Wire takeaway
CO2 capture tech involving purification and storage is gaining infrastructure scale in Sweden with EU grant support. You in carbon capture or waste-to-energy can now capture and permanently store biogenic emissions with logistics linked to Norway's offshore facility.
◆ Coverage
1 source · 16 Oct 2026
◆ Related on Wire
◆ Topics