Wire · technology
Shougang, Rio Tinto commission carbon capture trial facility at China steel plant
◆ Sectors
◆ Geography
◆ Source
◆ Verified
Fusion42 · 2 October 2026 · Fusion42 review
Chinese steel producer Shougang Group and mining firm Rio Tinto have launched an industrial-scale carbon capture trial facility at the Shougang Jingtang steel plant in Hebei Province, capable of capturing up to 10,000 tonnes of CO2 annually from blast furnace gas. The captured CO2 is planned to be utilised for biomass gasification processes to produce syngas, with aims to recycle it back into steelmaking and potentially scale carbon utilisation further.
This Wire brief sits within Fusion42's coverage of Industrial, and 3 sources have reported it between 28 Sep 2026 and 2 Oct 2026.
◆ ◆ The Wire takeaway
You now have a proven industrial example of carbon capture integrating with steel production. If your tech or service fits blast furnace decarbonisation or carbon recycling, this trial opens doors for deployment in China’s vast steel sector.
◆ Coverage
3 sources · first reported 28 Sep 2026 · latest 2 Oct 2026
◆ Related on Wire
◆ Topics