← Back

Wire · technology

Elon Musk says SpaceX's secret foundry can tackle AI's power bottleneck by producing turbine parts

Published

5 September 2026

Topic

technology

Sectors

AI & ML

Geography

United States

Source

Read at thecooldown.com

Verified

Fusion42 · 5 September 2026 · Fusion42 review

SpaceX is producing turbine blades and vanes in-house at a secret facility in Bastrop, Texas to accelerate natural gas turbine production and address a critical bottleneck in powering AI data centers. This move aims to reduce delays in bringing new gas turbines online, which are necessary to supplement solar power and meet the rapidly increasing electricity demand driven by AI infrastructure growth.

This Wire brief sits within Fusion42's coverage of AI & ML, and 8 sources have reported it between 30 Aug 2026 and 5 Sep 2026.

◆ The Wire takeaway

You must re-evaluate your AI infrastructure's power dependencies immediately as gas turbine availability is shifting from slow global supply chains to faster in-house production. This opens a narrow window to secure quicker access to scalable power solutions while the competition still faces long waits.

Coverage

8 sources · first reported 30 Aug 2026 · latest 5 Sep 2026

Related on Wire

Topics

AI & MLai-powergas-turbinesin-house-manufacturingdata-centersenergy-bottleneck